Construction of Allied Facilities and Installation of Toll Plaza on canal Expressway from Gattwala Bridge to Sahianwala (M-3) Interchange, Faisalabad

Project Introduction

Construction of an Expressway along canal will provide an alternate route for an access to the Motorway through Sahianwala Interchange. Realizing the situation City District Government Faisalabad proposed for Toll Plaza as Construction of Allied Facilities & Installation of Toll Plaza on Canal Expressway from Gattwala Bridge to Sahianwala (M-3) Interchange, Faisalabad, under PPP Mode (BOT). The above mentioned place has been selected keeping view the facility of the peoples of Faisalabad for Toll Plaza and Provision of Allied Facilities on Canal Expressway from Gattwala Bridge to Sahianwala (M-3) Interchange, Faisalabad, under PPP Mode (BOT).

Location

Faisalabad

Proposal Type

Solicited with BOT

Estimated Cost

PKR 267 million

Concession Period

25 Years

Concerned/Sponsoring Agency

Communication ad Works Department

Salient Features

  • C-Mart (14’x18’)
  • Construction of Tyre Shop (10’X10’)
  • Construction of Laverty Block (1x6)
  • Construction of Fencing with steel greeting  2x1200 = 2400 Rft
  • Galvanized wire meshes fancy 1500 mm high i/c prestressed and RCC posts complete in all respect as per M-2 standard.
  • P/L Tough paver 60000x2 = 120000 Sft
  • Toll Plaza and Allied Facilities with TTS 2x1800000
  • Ambulance
  • Break down vehicle
  • Installation of Petrol pump

Role of Government Agency

Provision of existing facility

Role of Private Party

Design, Build, Operate, Finance and Transfer

Current Status

Hiring of transaction advisory services to prepare PPP project proposal is in process. 

 

Counter

  • Site Counter: 620,239